2005 � 2006 PT. INDONESIA POWER UBP SAGULING - Centralized HVAC for Control & Relay Room, Power House Saguling
�
2005 � 2006 PLTN GN SALAK - Stainless Stell Pipe instalation for NCG Cooling Tower 1&2
�
2005 � 2006 SANBE CIMAREME STERILE PLANT - HVAC Commisioning Assistance
�
2004 � 2005 PURI INDAH MAL - Re-ducting & Isolation
�
2004 � 2005 INDOPOWER UBP KAMOJANG - HVAC System (Clean Room)
for Control & Relay Room
�
2004 � 2005 ARYADUTA HOTEL JAKARTA - Re-Insulation Chiller &
Pipe FCU
�
2003 � 2004 WTP TAMBUN PERTAMINA - Engineering Service for Instrumentation
& Piping
�
2003 � 2004 PT. UNILEVER INDONESIA - Design And Construction
For Fermentator Tan
�
2003 - 2004 TOTAL INDONESIE BALIKPAPAN - HVAC for Total Indonesie
Building, Balikpapan
�
2003 - 2004 PT. UNILEVER CIKARANG - As Built and Modification Drawing
�
2003 - 2004 WISMA MULIA - Air Conditioning & Ventilation Installation
�
2002 - 2003 PT. UNILEVER CIKARANG - Boiler & NH3 Insulation, BANK
BUKOPIN - Engineering for HVAC System, BANK BNI - Engineering for HVAC
System
�
2001 - 2002 PT. GUDANG GARAM KEDIRI - Mechanical and Insulation Sauce
Tank
�
1999 - 2000 PLN SURALAYA ANYER HVAC - Design for Control Room (Clean
Room) Advisor For Stone & Webster , Canada.
�
1996 � 1998 TAMAN ANGGREK MAL JAKARTA - Central Chilled Water
System , 5 Chillers, 120 AHU's.
Total Refr. Cap. 6.000 Tons
�
1994 � 1996 TUNJUNGAN PLAZA SURABAYA - Five Star Hotel 450 Rooms,
Offices and Shoping Areas, Total 60.000 SQM. Central Chilled Water
System, 5 Chillers, 80 AHU's. Total Refr. Cap. 4.000 Tons.
�
1993 � 1995 MULIA TOWER JAKARTA - Office Tower , 26 Story, Total
67.000 SQM. Central Chilled Water System, 4 Chillers, 50 AHU's 120
Fans, 1260 FCU'S. Total Refr. Cap. 2.400 Tons, MULIA CENTER JAKARTA
Office Tower , 17 Story, Total 43.000 SQM.Central Chilled Water
System, 3 Chillers, 31 AHU's-31 Fans, 926 FCU'S. Total Refr. Cap.
1.800 Tons, SHANGRI-LA HOTEL JAKARTA Five Star Hotel 700 Rooms.
Central Chilled Water System, 7 Chillers, 47 AHU'S, 100 Fans, 811
FCU'S. Total Refr. Cap. 2.400 Tons.
PAITON Steam Power Plan Central Chilled Water System, 10 Chillers,
8 AHU's- Total Refr. Cap. 800 Tons. Design, Supervision and Commissioning.
�
1990 � 1992 ST. CAROLUS HOSPITAL JAKARTA - Operating Rooms, (
Clean room ) , Total 4.000 SQM.
Central Chilled Water System, 2 Chillers, 15 AHU's-18 FCUS, Total
Cap. 200 Tons. Design, Supervision and Commissioning.
REGENT OF JAKARTA Five Star Hotel , 400 Rooms. Central Chilled Water
System, 6 Chillers, 44 AHU'S, 77 Fans, 510 FCU'S. Total Refr. Cap.
1.800 Tons.